The Sumner contract involved the extension of the existing pipeline from the intersection of Burgess Street and Esplanade across sensitive public areas and out falling through and existing rock breakwater wall. It also involved the construction of associated manholes and the outfall structure. Read more…
The Riccarton Main Drain Piping contract involved the installation of approximately 180 metres of 1350mm diameter RCRR concrete stormwater pipes, and 3 new manholes, and was completely located through the rear of private properties. Read more…
Dormer Construction has a robust site safety management plan. Attached is a document submitted to the Contractors Federation that outlines our safety plan, examples of safety meetings and examples of certificates held by staff. Read more…
The contract involved the removal and disposal of an existing timber drain and the formation of a newswale alongside the old drain. It also involved the construction of a predator moat in the Clarevale Reserve. Read more…
This contract involved the installation of 660 metres of 1050mm diameter stormwater pipes from a proposed pumping station in Stone Street, Kaiapoi, to the outfall into the Kaikanui Stream. Read more…
This contract involved the installation of new sewer reticulation to a significant area of the Oakura township close to New Plymouth. This was one of seven contracts let for the construction of sewers within the Oakura drainage district. Read more…
Dormer Construction has carried out various agriculture works over the past 15 years. Read more…
This contract involved the installation of 660 metres of 1050mm diameter stormwater pipes from a proposed pumping station in Stone Street, Kaiapoi, to the outfall into the Kaikanui Stream. Read more…
Dormer Construction Ltd was awarded the contract to construct all the sewer and storm water pipelines and structures on the stages at the Peninsula Bay subdivision, Wanaka. Read More…
This contract involved the replacement of 657 metres of 300mm diameter gravity sewer pipes from Ebbtide Street to No 301 Estuary Road. This sewer was completely below ground water level and varied in depth from 1.6 to 4 metres. Read More…
Dormer Construction was awarded the subcontract to lay the land based connecting pipeline for this Waimakariri District Council job off Pines Beach near Kaiapoi. Read More…
Dormer Construction and C&A Cox Ltd formed a joint venture submitted and were awarded a tender that involved the installation of 4.2km of 450mm diameter pressure pipes from an existing pumping station in Belfast to Lower Styx Road. Read More…
The existing open Blair’s drain was replaced by 180m of 525mm Class Z pipe. The drain ran along the back boundary of properties on Blairdon Lane, so the only access was along the line of the drain from Sawyers Arms Road. Read More…
A 475mm diameter Rib Strut uPVC pipe was required to be laid across, under the Northbrook Stream. Dormer Construction Limited was awarded the job as the preferred sub-contractor to BG Contracting. Read More…